Mitsubishi Heavy Industries SRK25GZ-L1 Handbook page 883

2000 air conditioning & heat pump machinery handbook
Table of Contents

Advertisement

(b) Bolt positions
1) Bolt positions for metal settings used for floor fixation.
• Metal fitting used for floor fixation (accessories).
Bolt positions for floor mounting hardware
Floor mounting hardware
Accessory
10 x 30 elongated hole
Use M8
Note (1) Value in ( ) indicates 71 type.
(c) Installation of unit
1) Floor standing installation
a) Position of mounting bracket fixing bolts
Drill holes by referring to figures below.
Hole for piping
& wiring on floor
b) The methed of drilling the wall is as follows.
Wall
Indoor
Ø70~86 mm
c) Level the unit using the level adjusting screw. Installation will be complrted after attaching side and front panel.
d) Exceute fixation following the directions described below.
● When fixed on the floor
Frame side panel
unit : mm
Front
Back
806(1091)
As viewed from floor side.
When fixed on the wall
4 places
Hole for piping &
wiring on wall
When fixed on the floor
2 places
Note (1) Be sure to use a bolt of the length for wall mouning.
Outdoor
Sleeve
Tighten the bolt for floor
fixation using a flat washer
and double nut.
Mounting platc
(Accessory)
2) Bolt positions for wall fixation
1150(1435)
112
786 (1071)
Elongated hole for
wall mounting
4 - 12
24
Use M10
Bolt for wall mounting
30 mm
Wall
Sealing plate
● When fixed on the wall
Tighten the bolt for wall
fixation using a flat washer
and double nut.
FDC-HKX
unit : mm
179
Screw for adjusting
levelness.
Wall
Sleeve
881

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35gz-l1Srk502z-l1Srk502z-lSrk328henf-l2Srk408henf-l2Srk501henf-l ... Show all

Table of Contents