Mitsubishi Heavy Industries SRK25GZ-L1 Handbook page 860

2000 air conditioning & heat pump machinery handbook
Table of Contents

Advertisement

FDC-HKX
2) Adjusting the unit's levelness
1 Adjust the out-of levelness using a level vial or by following method.
● Make adjustment so that the relation between the lower surface of the unit proper and water level in the hose becomes as
given below.
2 Unless the adjustment to the levelness is made properly, malfunctioning or failure of the float switch may occur.
3) Tap selection on blower unit
Taps of blower unit are set at the standard selection at the shipping from factory. Where the static pressure
is raised by changing the connection of connectors provided at the flank of control box as shown below.
(f) Installation of decorative panel
1) Case of silent panel
a) Accessory
b) Installation procedures
1 Remove the inner frame of panel
< How to remove the panel inner frame >
● Detach from pins (A) in the order of arrow 1
● Open slightly as the arrow 3 and move toward the arrow 4 and detach from pin (B)
858
Piping side
Supply water
Water level
0 ~ 5 mm
Bring the piping side slightly lower.
Standard tap (at shipping)
Red
Red
Blue
Blue
Black
Black
White
White
Name
Round head machine
screw (M5 x 35)
Panel inner frame
2 .
Panel outer frame
Pin (B)
Panel inner frame
PVC hose
High speed tap
Red
Blue
Blue
Black
Black
Brown
White
White
Q'ty
Position
4 pcs.
Securing the panel
Panel outer frame
Remove
Pin (A)
1
2
4
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35gz-l1Srk502z-l1Srk502z-lSrk328henf-l2Srk408henf-l2Srk501henf-l ... Show all

Table of Contents