5.5.6 Test run and handling instruction

(1) Inspection
Check according to the following check items.
(2) Test run
(a)
Carry out the test run for each unit individually. (If 2 units are tested at the same time, wrong wiring and wrong pipe
connections cannot be checked.)
(b)
After each individual test, run the units in all the rooms simultaneously and check the units.
(c)
Test both the cooling and the heating.
(Three-minute restart preventive timer)
When the air conditioner is restarted or when changing the operation, the unit will not start operating for approximately 3
minutes. This is to protect the unit and it is not a malfunction.
Installation test check points
Check the following points again after completion of the installation, and before turning on the power. Conduct a test
run again and ensure that the unit operates properly. At the same time, explain to the customer how to use the unit and
how to take care of the unit following the instruction manual.
After installation
The power supply voltage is correct as the rating.
No gas leaks from the joints of the service valve.
Power cables and crossover wires are securely inserted and fixed
to the terminal board.
Each indoor and outdoor unit is properly connected (no wrong
wiring or piping).
Service valve is fully open.
Refrigerant has been additionally charged (when the total pipe
length exceeds the refrigerant charged pipe length).
The pipe joints for indoor and outdoor pipes have been insulated.
Earthing work has been conducted properly.
Beware of wrong connections in refrigerant piping and wiring
¡
Make sure to match the piping and wiring from each unit to the outdoor unit.
¡
Be careful because if connections are wrong, normal operation cannot be achieved and may damage the compressor.
Indoor unit
210
Finish and fixing
Position so
the slit
comes on top.
[Correct connections]
A unit
A
Outdoor
unit
B
B unit
Pipe clamp
Apply exterior tape and shape along
Pipes
the place where the pipes will be rout-
Crossover wires
ed. Secure to the wall with a pipe
Exterior tape
clamp. Be careful not to damage the
Drain hose
pipes and the wires.
Tapping screw
Test run
Air conditioning and heating are normal.
No abnormal noise.
Water drains smoothly.
Protective functions are not working.
Operation of the unit has been explained
to the customer.
[Example of wrong connections]
Piping
Wiring
Indoor unit
A
A unit
B
B unit
Outdoor
unit

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35gz-l1Srk502z-l1Srk502z-lSrk328henf-l2Srk408henf-l2Srk501henf-l ... Show all

Table of Contents