Mitsubishi Heavy Industries SRK25GZ-L1 Handbook page 880

2000 air conditioning & heat pump machinery handbook
Table of Contents

Advertisement

FDC-HKX
(c) Installation of unit
1) Floor standing installation
a) Position of mounting bracket fixing bolts Drill holes by referring to figures below.
Hole for piping
& wiring on floor
b) The methed of drilling the wall is as follows.
Wall
Indoor
Ø70~86 mm
c) Remove the front and side panels.
Case front panel
Case side panel
d) Level the unit using the level adjusting screw. Installation will be complrted after attaching side and front panel.
e) Exceute fixation following the directions described below.
● When fixed on the floor
Frame side panel
878
When fixed on the wall
4 places
Hole for piping &
wiring on wall
When fixed on the floor
2 places
Note (1) Be sure to use a bolt of the length for wall mouning.
Outdoor
Sleeve
Case front panel
Case side panel
Case front panel
Tighten the bolt for floor
fixation using a flat washer
and double nut.
Mounting platc
(Accessories)
Bolt for wall mounting
30
Wall
Sealing plate
Side panel
● When fixed on the wall
Tighten the bolt for wall
fixation using a flat washer
and double nut.
Wall
Sleeve
Top panel
Frame

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35gz-l1Srk502z-l1Srk502z-lSrk328henf-l2Srk408henf-l2Srk501henf-l ... Show all

Table of Contents