Mitsubishi Heavy Industries SRK25GZ-L1 Handbook page 875

2000 air conditioning & heat pump machinery handbook
Table of Contents

Advertisement

b) Installation space dimensions
(Plug in dimensions)
c) Mount the unit using suspension bolts
d) Securely tighten the nuts and fix the indoor unit place.
e) Attach the side panels and fit in ceilling board in the space around the unit and the work is finished.
4) Gradient for drainage
Mounting with proper gradient for drainage is needed as shown below.
● In right and left directions
Note (1) In case of left-hand side drainage, the gradient will be to
the opposite side.
Unit upper
side
10
Suspension bolts
Flat washer (accessory parts)
Hexagonal nuts (accessory parts)
Fit in ceiling boards here
● Front and rear directions
Unit: mm
Ceiling board
10
Caution ● In case of gradient is contrary, water may leak out.
● Indoor side of drain pipe must be thermally insulated.
FDC-HKX
873

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35gz-l1Srk502z-l1Srk502z-lSrk328henf-l2Srk408henf-l2Srk501henf-l ... Show all

Table of Contents