(6) Indoor electrical components inspection flow-chart
Is there voltage between terminal
blocks 1 and 2 ? (AC 220 V)
YES
Is the noise filter good?
YES
Is the fuse burnt out? (3.15 A)
YES
Is there voltage between CNC (1)
and (2) on the secondary side of the
transformer? (Approx. 12 V)
YES
Is the voltage between terminal
blocks 2 and 3 oscillating between
DC 0 and 12V?
YES
Indoor electrical components
are normal.
NO
Inspect power source
for outdoor unit.
(1)
NO
Inspect noise filter.
NO
Replace fuse.
NO
Replace the transformer.
NO
Replace printed
circuit board.
Note (1) The noise filter inspection is not performed on ceiling
recessed type.
SCM-HG
(4 room)
173

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35gz-l1Srk502z-l1Srk502z-lSrk328henf-l2Srk408henf-l2Srk501henf-l ... Show all

Table of Contents