Drainage Test
When using the standard drain port, execute a drainage test after completion of electric work.
1 During the test run, make sure that drain flows properly through the piping and that no water leaks from connections.
2 Be sure to conduct this test even when the unit is installed in the heating season.
3 In case of a new building, conduct the test before it is furnished with the ceiling.
1)
Inject about 1,000cc by using a feed water pump from the grommet on the drain pump side.
2)
At the drain port (transparent portion), check if drainage is performed.
3)
After completion of the drain test, completely perform heat insulation fot the drain pipe up to the main unit.
(g) Fixing of Panel ( The panel fixing bolts are attached on the panel. )
Note (1) Care should be exercised in handling the supply air port on the panel because it is easily depressed by finger nail.
1)
Check with the accessory level gauges that the indoor unit height and the size of ceiling hole are correct.
Notes (1) Remove the level gauge from the indoor unit befroe fixing the panel.
(2) Remove the Air inlet panel from the panel proper.
Procedure for Dismounting the Air inlet Panel
848
Air inlet panel
Clear flexible tubing (optional)
Heat
insulation
Rubber plug
Remove
CNR (Blue·2P)
Natural drain port
Control box
Insert the tip of the supply water pump approximately
50 mm in a downward direction.
Pin (B)
Panel outer frame
Panel proper
Remove
Panel inner frame
Hard vinyl chloride piping.
General piping VP-20
Piping penetration cover
Pin (A)