Figure 26: Installing The Front Mounting Hardware For A Four-Post Rack Or Cabinet - Juniper SRX 5600 Hardware Manual

Services gateway
Hide thumbs Also See for SRX 5600:
Table of Contents

Advertisement

SRX 5600 Services Gateway Hardware Guide
To install the mounting shelf on the front rails of a four-post rack or cabinet, or the
rails of an open-frame rack:
1.
2.
3.
4.
5.

Figure 26: Installing the Front Mounting Hardware for a Four-Post Rack or Cabinet

50
Installing the Mounting Hardware for a Rack or Cabinet
If needed, install cage nuts in the holes specified in Table 25 on page 49.
On the back of each rack rail, partially insert a mounting screw into the lowest
hole specified in Table 25 on page 49.
Install the mounting shelf on the back of the rack rails. Rest the bottom slot of
each flange on a mounting screw.
Partially insert the remaining three screws into the open holes in each flange of
the mounting shelf (see Figure 26 on page 50 or Figure 27 on page 51).
Tighten all the screws completely.

Advertisement

Table of Contents
loading

Table of Contents