Connecting Power To An Ac-Powered Services Gateway; Connecting Power To A Dc-Powered Services Gateway - Juniper SRX 5600 Hardware Manual

Services gateway
Hide thumbs Also See for SRX 5600:
Table of Contents

Advertisement

SRX 5600 Services Gateway Hardware Guide
5.
6.
NOTE: After powering off a power supply, wait at least 60 seconds before turning it
back on. After powering on a power supply, wait at least 60 seconds before turning
it off.
If the system is completely powered off when you power on the power supply, the
Routing Engine boots as the power supply completes its startup sequence. If the
Routing Engine finishes booting and you need to power off the system again, see .
After a power supply is powered on, it can take up to 60 seconds for status
indicators—such as the status LEDs on the power supply and the
command display—to indicate that the power supply is functioning normally. Ignore
error indicators that appear during the first 60 seconds.
7.

Connecting Power to a DC-Powered Services Gateway

CAUTION: Do not mix AC and DC power supplies within the same device. Damage
to the device might occur.
66
Connecting Power to a DC-Powered Services Gateway
connecting management devices, see "Connecting the Services Gateway to
Management and Alarm Devices" on page 57.
Turn on the power to the external management device.
Switch the AC switch on each power supply to the on position (
the status LEDs on each power supply faceplate. If an AC power supply is correctly
installed and functioning normally, the
the
LED is not lit.
PS FAIL
If any of the status LEDs indicates that the power supply is not functioning
normally, repeat the installation and cabling procedures described in "Replacing
Power System Components" on page 133.
On the external management device connected to the Routing Engine, monitor
the startup process to verify that the system has booted properly.
|
AC OK
and
DC OK
LEDs light steadily, and
show chassis
) and observe

Advertisement

Table of Contents
loading

Table of Contents