SRX 5600 Services Gateway Hardware Guide
2.
3.
Figure 71: Removing or Installing the Cable Management System
Installing the Cable Management System
To install the cable management system (see Figure 71 on page 144):
1.
2.
3.
4.
144
Replacing the Cable Management System
Loosen the captive screws on either side of the chassis.
Remove the cable manager.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
connect the strap to one of the ESD points on the chassis. For more information
about ESD, see "Preventing Electrostatic Discharge Damage" on page 152.
Position the cable management system on the front sides of the chassis.
Insert the tabs into the slots.
Tighten the captive screws completely.