Figure 48: Removing An Scb - Juniper SRX 5600 Hardware Manual

Services gateway
Hide thumbs Also See for SRX 5600:
Table of Contents

Advertisement

SRX 5600 Services Gateway Hardware Guide
Removing an SCB
To remove an SCB (see Figure 48 on page 110):
NOTE: The SCB and Routing Engine are removed as a unit. You can also remove the
Routing Engine separately.
1.
2.
3.
4.
5.
6.
7.
8.

Figure 48: Removing an SCB

Installing an SCB
To install an SCB (see Figure 49 on page 112):
110
Replacing Host Subsystem Components
Power off the device. See "Powering Off the Services Gateway" on page 70.
Place an electrostatic bag or antistatic mat on a flat, stable surface.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
connect the strap to one of the ESD points on the chassis. For more information
about ESD, see "Preventing Electrostatic Discharge Damage" on page 152.
Rotate the ejector handles simultaneously counterclockwise to unseat the SCB.
Grasp the ejector handles and slide the SCB about halfway out of the chassis.
Place one hand underneath the SCB to support it and slide it completely out of
the chassis.
Place the SCB on the antistatic mat.
If you are not replacing the SCB now, install a blank panel over the empty slot.

Advertisement

Table of Contents
loading

Table of Contents