Figure 84: Installing an SCB
Reinstalling IOCs and SPCs
To reinstall the IOCs and SPCs, follow this procedure for each card (see Figure 85 on
page 212):
1.
2.
3.
4.
5.
6.
7.
8.
Appendix F: Installing the Services Gateway Without a Mechanical Lift
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
connect the strap to one of the ESD points on the chassis. For more information
about ESD, see "Preventing Electrostatic Discharge Damage" on page 152.
Place the card on an antistatic mat or remove it from its electrostatic bag.
Identify the slot on the services gateway where it will be installed.
Verify that each fiber-optic has a rubber safety cap covering the transceiver. If
it does not, cover the transceiver with a safety cap.
Orient the card so that the faceplate faces you.
Lift the card into place and carefully align the sides of the card with the guides
inside the card cage.
Slide the card all the way into the card cage until you feel resistance.
Grasp both ejector handles and rotate them clockwise simultaneously until the
card is fully seated.
Reinstalling Components in the Chassis
211