Juniper SRX 5600 Hardware Manual page 163

Services gateway
Hide thumbs Also See for SRX 5600:
Table of Contents

Advertisement

Removing a DC Power Supply
The power supplies are located at the rear of the chassis. Each DC power supply
weighs approximately 3.8 lb (1.7 kg).
CAUTION: Do not leave a power supply slot empty for more than 30 minutes while
the services gateway is operational. For proper airflow, the power supply must remain
in the chassis, or a blank panel must be used in an empty slot.
NOTE: After powering off a power supply, wait at least 60 seconds before turning it
back on.
To remove a DC power supply (see Figure 67 on page 138):
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Switch off the dedicated facility circuit breaker for the power supply being
removed. Follow your site's procedures for ESD.
Make sure that the voltage across the DC power source cable leads is 0 V and
that there is no chance that the cables might become active during the removal
process.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
connect the strap to one of the ESD points on the chassis. For more information
about ESD, see "Preventing Electrostatic Discharge Damage" on page 152.
Switch the circuit breaker on the power supply faceplate to the
Remove the clear plastic cover protecting the terminal studs on the faceplate.
Remove the nuts and washers from the terminal studs. (Use a 3/8-in. nut driver
or socket wrench.)
Remove the cable lugs from the terminal studs.
Loosen the captive screws on the bottom edge of the power supply faceplate.
Carefully move the power cables out of the way.
Pull the power supply straight out of the chassis.
Chapter 13: Replacing Hardware Components
Replacing Power System Components
OFF
position
O
.
137

Advertisement

Table of Contents
loading

Table of Contents