Installing The Cable Management System; Figure 85: Installing An Ioc Or Spc; Figure 86: Installing The Cable Management System - Juniper SRX 5600 Hardware Manual

Services gateway
Hide thumbs Also See for SRX 5600:
Table of Contents

Advertisement

SRX 5600 Services Gateway Hardware Guide

Figure 85: Installing an IOC or SPC

Installing the Cable Management System

The cable management system attaches to both sides of the card cage. To install the
cable management system (see Figure 86 on page 213):
1.
2.
3.
4.
212
Installing the Cable Management System
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
connect the strap to one of the ESD points on the chassis. For more information
about ESD, see "Preventing Electrostatic Discharge Damage" on page 152.
Position the cable management system on the front sides of the chassis.
Insert the tabs into the slots.
Tighten the captive screws completely.

Advertisement

Table of Contents
loading

Table of Contents