2. Pull out the conveying unit.
3. Remove two screws (a)(M4x8) and
open the front middle cover (b).
4. Lock the developer waste exit that has-
been released. (Refer P.2-14)
5. Remove the screw (c) and open the
connector cover (d).
6. Disconnect the connector (e).
7. Release the wire saddle (f).
8. Remove four fixing screws (b) of the
inner unit (a).
d
c
b
a
a
b
4-31
2WA/2NJ/2RK
e
f
Figure 4-36
a
Figure 4-37
a
b
b