Compaq AlphaServer ES45 Service Manual page 310

Hide thumbs Also See for AlphaServer ES45:
Table of Contents

Advertisement

!
WARNING: To prevent injury, access is limited to persons who
have appropriate technical training and experience. Such per-
sons are expected to understand the hazards of working within
this equipment and take measures to minimize danger to them-
selves or others.
WARNING: To prevent injury, unplug the power
cord from each power supply before installing com-
ponents.
Installing the Right Cage (or Top Cage)
1. Shut down the operating system and turn off power to the system. Unplug
the power cord from each power supply.
2. Remove enclosure panels and remove the cover from the PCI card cage.
NOTE: When installing a drive cage into the left cage area, remove fans 3 and 4.
3. Install a SCSI controller
4. Unscrew the four screws securing the drive cage filler plate
aside. Remove and discard the filler plate.
5. Attach the 10-pin cable (17-03971-11)
6. Snap the environmental card onto the rearmost set of four pop inserts in the
top of the PCI card cage.
7. Snap open the cable management clip
the opening
and the clip and route as shown.
8. Plug the shorter end of the 68-pin cable
troller. Plug the middle connector into the environmental card, route as
shown, and close the clip.
8-46
ES45 Service Guide
in the PCI backplane.
to the environmental card
. Thread the 10-pin cable through
(17-04867-01) into the SCSI con-
and set them
.

Advertisement

Table of Contents
loading

Table of Contents