9.
Make a single loop in the part of the cable which has passed through the gap in the hinge, and attach the
ferrite core [A] to it.
10. Reattach the operation panel right cover.
When reattaching the cover, pass the USB cable through the U-shaped groove [A] at the hinge of the
operation panel and notch [B] on the cover under the cover.
2.Installation
223