Juniper PTX10008 Hardware Manual page 210

Packet transport router
Hide thumbs Also See for PTX10008:
Table of Contents

Advertisement

CAUTION:
controllers installed. Lifting the chassis and mounting it in a rack or cabinet requires at
least three people. Make sure the chassis is empty (contains only the backplane) before
you lift it.
The chassis has two handles that are designed for subtle positioning of the chassis. Do
not lift the chassis by the handles.
CAUTION:
that the rack is strong enough to support the router's weight and is adequately supported
at the installation site.
Before you install the router:
1. Prepare the site for installation as described in
2. Ensure the site has adequate clearance for both airflow and hardware maintenance as described in
"PTX10000 Clearance Requirements for Airflow and Hardware Maintenance" on page
3. Unpack the router as described in
4. Remove all components except the two fan tray controllers from the chassis. See:
Removing a PTX10000 Routing and Control Board on page 250
Removing a PTX10000 Switch Interface Board on page 332
Removing a PTX10000 Fan Tray on page 258
"How to Remove a JNP10K-PWR-AC Power Supply" on page 270
JNP10K-PWR-DC Power Supply on page 292
5. Install the mounting hardware at the desired position (see
PTX10000" on page
6. Review chassis lifting guidelines as described in QFX10002 Installation Safety Guidelines.
Ensure that you have the following parts and tools available to install the router:
14 mounting screws appropriate for your rack
A Phillips (+) screwdriver, number 2 or number 3, depending on the size of your rack-mounting screws
The chassis weighs approximately 145 lb (66 kg) with only the fan tray
Before front-mounting the router in a rack, have a qualified technician verify
"Unpacking the PTX10008" on page
206).
"PTX10000 Site Preparation Checklist" on page
or
"Installing the Mounting Hardware for a
156.
198.
How to Remove a
213
149.