Juniper PTX10008 Hardware Manual page 156

Packet transport router
Hide thumbs Also See for PTX10008:
Table of Contents

Advertisement

Figure 70: Clearance Requirements for Airflow and Hardware Maintenance for a PTX10016 Chassis
24" ( 6 1cm)
Clearan ce requi red
Front mounting flange
for main t enan ce
Ports
19"
(4 8 .3 cm)
(Mounting
flange
width)
5.1" (13 cm.)
Cable management depth
6.1" (15.5 cm.)
Front panel depth
12" (30.5 cm.)
For airflow
Figure 71: Clearance Requirements for Airflow and Hardware Maintenance for a PTX10016 with
JNP10008-FAN2
30 in. (76.2 cm)
Clearance required
for maintenance
Ports
19 in.
(48.3 cm)
(Mounting
flange width)
Follow these guidelines:
For the cooling system to function properly, the airflow around the chassis must be unrestricted. See
"PTX10008 Cooling System and Airflow" on page 46
about the airflow through the chassis.
If you are mounting a PTX10000 in a rack with other equipment, ensure that the exhaust from other
equipment does not blow into the intake vents of the chassis.
Leave at least 24 in. (61 cm) both in front of and behind the PTX10000 for service personnel to remove
and install hardware components. To be NEBS GR-63 compliant, allow at least 30 in. (76.2 cm) in front
of the rack and 24 in. (61 cm) behind the rack.
Clearan ce requi red
35 "
(88 .9 cm)
3" (7.6 cm)
32 "
(81 .3 cm)
12" (30.5 cm)
For airflow
35 in.
(88.9 cm)
36.7 in.
(93.2 cm)
34.2 in.
(86.8 cm)
and PTX10016 Cooling System for more information
24 " ( 6 1cm)
f or main t enan ce
FRUs
17.4"
(4 4 .2 cm)
4 " (10.2 cm)
Power cable depth
24 in (61 cm)
Clearance required
for maintenance
FRUs
17.4 in.
(44.2 cm)
158

Hide quick links:

Advertisement

Table of Contents
loading