Agilent Technologies Bravo Platform User Manual page 180

Hide thumbs Also See for Bravo Platform:
Table of Contents

Advertisement

C AU T I O N
Bravo Platform User Guide
Figure
Placing the Peltier Thermal Station into the deck hole
a
Carefully slide the cable into the cutout hole first before you place the Peltier
Thermal Station assembly into the cutout.
b
Ensure that the safety label
c
Press and hold from the bottom to squeeze in the metal as you insert the
Peltier Thermal Station assembly into the hole.
d
Position the bracket around the outside edges of the top area of the assembly.
e
If there is slight resistance when fitting the assembly into the cutout or when
positioning the bracket, you may use a rubber mallet to tap the metallic base or
bracket into place.
Using too much force to tap the base into place can damage the Peltier Thermal
Station.
Figure
Tapping the Peltier Thermal Station bracket in place
f
Ensure that the Peltier Thermal Station sits flush in the cutout and that the
bracket is seated on the Bravo deck.
5
Install the four M3 bolts that secure the bracket to the deck.
A Accessories and platepads
Installing and configuring the Peltier Thermal Station
faces the front of the Bravo deck.
169

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents