Agilent Technologies Bravo Platform User Manual page 168

Hide thumbs Also See for Bravo Platform:
Table of Contents

Advertisement

Before you start
WAR NIN G
Installing the
Heating Shaking Station
Bravo Platform User Guide
To prevent potential injury and damage to the device, turn off the Bravo Platform
before you install or remove an accessory.
The Heating Shaking Station may be installed at any deck location using the short
adapter pad instead of a platepad.
Heating Shaking Station, including adapter pad, M6 x 12 flathead screw (to attach
the adapter pad), and two M3 x 18 socket-head cap-screws
2.5-mm and M5 hex wrenches, crosstip driver, flathead driver
Inheco STC or MTC Controller with the corresponding PCA installed for the Heating
Shaking Station, power and communication cables, and Inheco user
documentation
Use the following workflow.
Step
For this task...
1
Set up the Inheco MTC or STC
Controller.
For guidance, contact Agilent
Automation Solutions Technical
Support.
2
Install the Heating Shaking Station on
the Bravo deck.
3
Set up the station in the software:
a
Configure the station in the
Bravo profile.
b
Test the station functioning.
c
Set the teachpoint.
To install the Heating Shaking Station:
1
Remove the M6 screw in the center of the platepad. Remove the platepad.
2
Position the adapter pad in the predetermined deck location aligning the dowel
pins in the corresponding holes on the deck.
Make sure the adapter pad sits level on the deck.
3
Insert the M6-x-12-mm flathead screw into the center of the adapter pad and
tighten the screw.
A Accessories and platepads
Installing a Heating Shaking Station
See...
Manufacturer documentation
"Installing the Heating Shaking
Station" on page 157
"Setting up thermal and shaking
stations (Inheco controller)" on
page 159
157

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents