Mazda CX-9 Grand Touring 2009 Manual page 1602

Table of Contents

Advertisement

Courtesy of MAZDA MOTORS CORP.
3. Tighten the bolts on the No.1 engine mounting bracket in the order of A, B.
Tightening torque
93.1-116.6 N.m {9.50-11.8 kgf.m, 68.7-85.9 ft.lbf}
4. Teighten the No.1 engine mount bolt A at the specified torque.
Tightening torque
93.1-116.6 N.m {9.50-11.8 kgf.m, 68.7-85.9 ft.lbf}
Fig. 29: Identifying No.1 Engine Mounting Bracket Bolts
Courtesy of MAZDA MOTORS CORP.
5. Install the steering gear and linkage, front stabilizer, front lower arm and front crossmember component.
6. Tighten the No.1 engine mount bolt (crossmember side).
Tightening torque 93.1-116.6 N.m {9.50-11.8 kgf.m, 68.7-85.9 ft.lbf}
TRANSVERSE MEMBER REMOVAL/INSTALLATION
1. Remove the transverse member.
2008 Mazda CX-9 Grand Touring
2008 SUSPENSION Front Suspension - Mazda CX-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-9 grand touring 2008

Table of Contents