Mazda CX-9 Grand Touring 2009 Manual page 1470

Table of Contents

Advertisement

Tightening Torque
TIGHTENING TORQUE SPECIFICATION
Step
Installation position
1
1-16
2
1-16
3
1-16
4
1-16
5
1-16
6
17, 18
Fig. 91: Identifying Cylinder Head Bolts Tightening Sequence (Engine Front Side)
Courtesy of MAZDA MOTORS CORP.
CAMSHAFT COMPONENT INSTALLATION NOTE
1. Assemble the camshaft timing chain tensioners on both sides.
Tightening torque: 8.5-11.5 N.m {87-117 kgf.cm, 76-101 in.lbf}
NOTE:
2. Install the camshaft component (RH).
1. Install the camshaft timing chain by aligning the colored links on the camshaft timing chain with
2008 Mazda CX-9 Grand Touring
2008 ENGINE Mechanical (MZI-3.7) - Mazda CX-9
20 N.m {2.0 kgf.m, 15 ft.lbf}
35 N.m {3.6 kgf.m, 26 ft.lbf}
90°
90°
90°
8.5-11.5 N.m {87-117 kgf.cm, 76-101 in.lbf}
Install the camshaft, camshaft sprocket and camshaft timing chain of
the both bank as a single unit.
Tightening torque

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-9 grand touring 2008

Table of Contents