Mazda CX-9 Grand Touring 2009 Manual page 1781

Table of Contents

Advertisement

REMOVAL/INSTALLATION .)
9. Remove the cowl grille. (See COWL GRILLE REMOVAL/INSTALLATION .)
10. Remove the windshield wiper motor. (See WINDSHIELD WIPER MOTOR
REMOVAL/INSTALLATION .)
11. Remove the dashboard. (See DASHBOARD REMOVAL/INSTALLATION .)
12. Remove the rear heat duct fasteners and slide the rear heat duct rearward. (See REAR HEAT DUCT
COMPONENT REMOVAL/INSTALLATION.)
13. Disconnect the drain hose.
14. Remove the nuts.
15. Remove the bracket.
16. Remove the bolts.
17. Remove the dashboard bracket.
Fig. 2: Identifying Dashboard Bracket, Nuts, Bolts & Torque Specifications
18. Remove the hose clips.
19. Remove the front heater hose No.3 and front heater hose No.4. (See HEATER PIPE AND HOSE
COMPONENT REMOVAL/INSTALLATION.)
Fig. 3: Identifying Hose Clips Of Front Heater Hose No.3 & Front Heater Hose No.4
20. Remove the front cooler pipe No.1 bracket installation nut.
2008 Mazda CX-9 Grand Touring
2008 HVAC Basic System - Mazda CX-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-9 grand touring 2008

Table of Contents