4. Turn the crankshaft clockwise so that the crankshaft keyway is in the 11 o'clock position. (This will
position the No.1 cylinder at TDC.)
5. Follow the TIMING CHAIN REMOVAL/INSTALLATION" procedure and install the timing chain. (See
TIMING CHAIN REMOVAL/INSTALLATION [MZI-3.7].)
Fig. 102: Turning Crankshaft Clockwise
Courtesy of MAZDA MOTORS CORP.
FRONT OIL SEAL REPLACEMENT [MZI-3.7]
1. Disconnect the negative battery cable.
2. Remove the engine cover. (See ENGINE COVER REMOVAL/INSTALLATION [MZI-3.7].)
3. Position the power steering reserve tank out of the way. (See POWER STEERING OIL PUMP
REMOVAL/INSTALLATION .)
4. Remove the both front wheels and tires. (See GENERAL PROCEDURES (SUSPENSION) .)
5. Remove the splash shield (RH).
6. Position the both ABS wheel-speed sensor out of the way. (See FRONT ABS WHEEL-SPEED
SENSOR REMOVAL/INSTALLATION .)
7. Position the front stabilizer control link (lower side) (RH) out of the way. (See FRONT STABILIZER
REMOVAL/INSTALLATION .)
8. Position the tie-rod end ball joint (RH) out of the way. (See FRONT CROSSMEMBER
REMOVAL/INSTALLATION .)
9. Remove the front shock absorber (LH) lower side bolts, position and secure the wheel hub and steering
knuckle component (LH) out of the way with a rope or wire. (See FRONT SHOCK ABSORBER AND
COIL SPRING REMOVAL/INSTALLATION .)
10. Disconnect the front drive shaft (RH) from the joint shaft side. (See FRONT DRIVE SHAFT
REMOVAL/INSTALLATION .)
11. Remove the front pipe and middle pipe as a single unit. (See EXHAUST SYSTEM
REMOVAL/INSTALLATION [MZI-3.7] .)
12. Position the propeller shaft out of the way. (AWD) (See PROPELLER SHAFT
REMOVAL/INSTALLATION .)
13. Remove the generator and A/C drive belt. (See DRIVE BELT REMOVAL/INSTALLATION [MZI-
2008 Mazda CX-9 Grand Touring
2008 ENGINE Mechanical (MZI-3.7) - Mazda CX-9