Mazda CX-9 Grand Touring 2009 Manual page 1433

Table of Contents

Advertisement

Fig. 29: Locating Alignment Marks On Camshaft Timing Chain (LH)
Courtesy of MAZDA MOTORS CORP.
3. Remove the retaining wire inserted into the camshaft timing chain tensioner (RH).
4. Tighten the new camshaft sprocket (RH) installation bolts using the following 4 steps.
1. Tighten to 40 N.m {4.1 kgf.m, 30 ft.lbf}.
2. Loosen 360 ° (one full turn) in reverse order.
3. Tighten to 10 N.m {102 kgf.cm, 89 in.lbf}.
4. Tighten to 90 °
5. Install the variable valve timing actuator, camshaft timing chain and the exhaust camshaft sprocket of the
LH bank as a single unit.
Fig. 30: Locating Retaining Wire Into Camshaft Timing Chain Tensioner
Courtesy of MAZDA MOTORS CORP.
6. Remove the retaining wire inserted into the camshaft timing chain tensioner (LH).
2008 Mazda CX-9 Grand Touring
2008 ENGINE Mechanical (MZI-3.7) - Mazda CX-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-9 grand touring 2008

Table of Contents