Mazda CX-9 Grand Touring 2009 Manual page 1441

Table of Contents

Advertisement

performed after the engine and transaxle component is removed from the
vehicle. (See ENGINE REMOVAL/INSTALLATION [MZI-3.7].)
1. Drain the engine oil. (See ENGINE OIL REPLACEMENT [MZI-3.7] .)
2. Remove the engine and transaxle component. (See ENGINE REMOVAL/INSTALLATION [MZI-
3.7].)
3. Secure the engine and transaxle component using a hoist and the SST.
Fig. 39: Identifying Engine & Transaxle Component With SST
Courtesy of MAZDA MOTORS CORP.
4. Remove the dynamic chamber and throttle body as a single unit. (See INTAKE-AIR SYSTEM
REMOVAL/INSTALLATION [MZI-3.7] .)
5. Remove the ignition coils. (See IGNITION COIL REMOVAL/INSTALLATION [MZI-3.7] .)
6. Remove the dipstick.
7. Remove the power steering oil pump drive belt. (See DRIVE BELT REMOVAL/INSTALLATION
[MZI-3.7].)
8. Remove the power steering oil pump. (See POWER STEERING OIL PUMP
REMOVAL/INSTALLATION .)
9. Remove in the order indicated in the table.
10. Install in the reverse order of removal.
11. Start the engine and:
1. Inspect the runout and contact on the pulley and belt.
2. Inspect for engine oil, engine coolant, ATF, power steering fluid and fuel leakage.
3. Verify the ignition timing, idle speed and idle mixture. (See ENGINE TUNE-UP [MZI-3.7].)
2008 Mazda CX-9 Grand Touring
2008 ENGINE Mechanical (MZI-3.7) - Mazda CX-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-9 grand touring 2008

Table of Contents