Mazda CX-9 Grand Touring 2009 Manual page 1803

Table of Contents

Advertisement

7. Console panel (See CONSOLE PANEL REMOVAL/INSTALLATION .)
8. Console cover (See CONSOLE COVER REMOVAL/INSTALLATION .)
9. Console (See CONSOLE REMOVAL/INSTALLATION .)
10. Front seat (passenger side) (See FRONT SEAT REMOVAL/INSTALLATION .)
11. Bolt
12. Screws
13. Rear cooler pipe No.1 bracket.
12. Jack up the vehicle.
Fig. 31: Identifying Rear Cooler Pipe & Torque Specifications
13. Remove the nuts and disconnect the presilencer and middle pipe.
14. Disconnect the rubber hanger.
15. Remove the bolts and presilencer insulator.
16. Remove the bolts.
17. Remove the nut and fastener.
18. Remove the under guard (RH).
19. Remove the transverse member retaining bolts and set the transverse member out of the way. (See
TRANSVERSE MEMBER REMOVAL/INSTALLATION .)
2008 Mazda CX-9 Grand Touring
2008 HVAC Basic System - Mazda CX-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-9 grand touring 2008

Table of Contents