C0B75:Punch Control Board Malfunctions - Konica Minolta Bizhub C350 Service Manual

Includes: standard controller df-601 pc-101/pc-201 pc-401 ad-501 fs-501
Hide thumbs Also See for Bizhub C350:
Table of Contents

Advertisement

Trouble code
2.3.8

C0B75:Punch Control Board malfunctions

A. Detection timing
Malfunction code
No response is received to a request made by the Finisher within a given period of
time during initial communications.
No response is received to a request made by the Finisher within a given period of
time during ordinary communications.
C0B75
There is no match in the checksum values of the backup data as checked twice.
The 24 V power source of the Punch Unit is OFF when an operation request is
made from the Finisher.
B. Action
Finisher Control Board (PWB-A FN)
Punch Control Board (PWB-B PK)
Step
1
Turn OFF and ON the main switch.
Check the connection condition between
2
the Punch Unit and PWB-A FN.
Measure the voltage between CN14-5
3
(+) and CN14-3 (-) of the PWB-A FN. Is
the voltage 24VDC?
4
Initialize Punch Unit EEP-ROM.
5
PWB-B PK replacement
6
PWB-A FN replacement
Relevant electrical parts
Action
4-18
bizhub C350 Field Service Ver.1.0 Mar. 2004
Description
WIRING DIAGRAM
Control signal
-
-
-
-
-
-
Location
(Electrical compo-
nents)
-
-
-
-
C-1
E-6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents