Lucent Technologies MERLIN LEGEND Release 5.0 Installation Manual page 68

Hide thumbs Also See for MERLIN LEGEND Release 5.0:
Table of Contents

Advertisement

MERLIN LEGEND Communications System Release 5.0
Installation 555-650-140
Installing the Control Unit
Installing the Basic Carrier
To install the basic carrier, follow the steps below:
Mark the screw-hole locations on the backboard, using the basic


carrier or the template supplied with the plastic preassembled
backboard as a guide. See
Make sure the carrier is level before marking the holes.
Drill a pilot hole in the center of each of the four screw-hole marks.


Anchor the screws approximately halfway into the backboard.


Position the carrier on the screws and slide the carrier to the left.


Tighten the screws.


Figure 2-5.
Marking the Basic Carrier Screw Holes
Mounting Surface
Mounting
Screw
Figure
2-5.
Backboard
Basic
Carrier
Issue 1
June 1997
Page 2-19

Advertisement

Table of Contents
loading

Table of Contents