Powering Down The System - Lucent Technologies MERLIN LEGEND Release 5.0 Installation Manual

Hide thumbs Also See for MERLIN LEGEND Release 5.0:
Table of Contents

Advertisement

MERLIN LEGEND Communications System Release 5.0
Installation 555-650-140
Installing the Control Unit

Powering Down the System

Powering Down the System
You may need to power down the system for troubleshooting during installation,
or to add new equipment to the carrier.
!
CAUTION:
Follow these steps in the exact sequence.
To power down the system, follow the steps below.
Turn off the power supply on the basic carrier.


Turn off the power supplies on the expansion carriers.


Unplug any auxiliary power units.


Because the power supplies are already off, the sequence for removing
auxiliary power cords is not important.
Unplug the system from the AC outlet.


Issue 1
June 1997
Page 2-46

Advertisement

Table of Contents
loading

Table of Contents