height adjustable bench
Section:
FRAMES & WORKSURFACE
ROUTE CABLES THROUGH SYSTEM LINK
UNDERSIDE VIEW
OPTIONAL
Connects to
HAB
STEP 5: Route cables through System Link to electrically connect both systems
Installation Guides
Connects
to Interpret
STEP 6: Insert the Top Bracket hooks into the vertical slots on the System Link Cover and
allow Cover to slide slightly down
INSTALL FRAME LINK COVER
Date: May 2019
Page: 5 of 5
HABN_122
3
Need help?
Do you have a question about the Navigate height-adjustable bench and is the answer not in the manual?
Questions and answers