8 Control support devices
PSC-6RAD
ii. When using the cover. It can be installed at the right and left side of room air-conditioner. Double-face tape fixes
the cover and RAC adapter.
Example of installation:
b. In case that it cannot be installed to the wall due to the space or material problem, double-face tape is used for
installation on the room air-conditioner.
i. Confirm if the piping cover of the Unit can be removed when performing the service maintenance, and then fix
RAC adapter in the side of room air-conditioner with double-face tape. (Available at the right as well as left side)
ii. Clean with a dry cloth the surface to be installed.
N O T E
Consider the following points since the adhesivity changes according to the environmental conditions (temperature, humidity etc).
•
The adhesivity is decreased in the humidity or oil.
•
Warm the adhesive part and installation place of Double-face tape to avoid the decrease of the adhesivity in case that ambient tem-
perature is low.
•
Do not touch the adhesive part by fingers nor re-use it many times.
•
Any forced power shall not be added in 24 hours after the installation.
712
TCGB0106 rev.0 - 12/2014
RAC
adapter
Room Air-conditioner
Wiring outlet
Keep a distance
of 10mm
Room Air-conditioner
RAC adapter
Cover
Fix it to RAC adapter with the
enclosed double-face tape
40 mm
Cover
40 mm