5 Centralised remote controls
PSC-A32MN

5.2.2.6 Installation space

Keep the installation space for the central station as shown below.
30
Do not place anything in the shaded area "
When installing two or more central stations side by side, keep the following separation between each of them.
* Vertical space:
50 mm
* Horizontal space:
30 mm

5.2.2.7 Installation procedure

1 Install the switch box into the wall. (Field supplied JIS switch box for 2 switches (with cover) (JIS C 8340))
2 Open the unit case, in case that it is closed. (It is shipped opened from the factory). Follow the procedure below to
open the case.
a. Remove the front side of the case by inserting and rotating a tool like the tip of a slotted screwdriver in the notches (2
notches on the lower side).
b. To open the case, pull up the front side from the bottom and unhook the tabs at the upper and lateral sides. Do
not apply an excessive force when opening the front and rear sides of the case, as they are joined with connec-
tion bands.
Front case
View from lower side
294
TCGB0106 rev.0 - 12/2014
50
120
140
30
30
Approx. 6 mm
Slotted screw driver
(Unit: mm)
52.7
22
".
Rear case
Front case
Connection band
70
Catch for
fixing

Advertisement

Table of Contents
loading

Table of Contents