Figure 45. Fastening the screws
Wall mount/ceiling mount configuration
Follow instructions in this section to remove and install the wall mount/ceiling mount configuration.
Remove a node from the wall or the ceiling
Follow instructions in this section to remove a node from the wall or the ceiling.
About this task
Attention:
• Read
"Installation Guidelines" on page 47
work safely.
• Reserve 500 mm of clearance in front of the node for installation/removal procedure.
Important: This task must be operated by trained technicians.
Note: Depending on the model, your server might look slightly different from the illustration.
Procedure
Step 1.
If applicable, remove the security bezel.
a.
Unlock the security bezel with the key.
b.
Press the tab to disengage the security bezel.
c.
Pivot the security bezel outward, and remove the security bezel.
and
"Safety inspection checklist" on page 48
Chapter 5
to ensure that you
.
Hardware replacement procedures
69