Figure 281. Securing the riser assembly
Step 6.
Bundle the riser assembly cables together with a velcro strap; then, push the bundled cables
toward the riser card.
Note: To make sure adequate system cooling, the cables should be routed away from the space
for PMB air baffle.
Figure 282. Cable routing for riser assembly
After this task is completed
ThinkEdge SE360 V2 User Guide
262