Removal Of Pt Unit / Gas Shock Absorber - TOHATSU MFS 25D Service Manual

4 stroke
Hide thumbs Also See for MFS 25D:
Table of Contents

Advertisement

Bracket

14) Removal of PT Unit / Gas Shock Absorber

1.
Fully tilt up the outboard motor and lock it with the tilt
stopper 1.
• Leaving the outboard motor up without
locking may lead to accidental descent
due to the reduction of PT unit hydraulic
pressure. Be sure to lock the motor with
the stopper when the outboard motor is
tilted up.
• When removing and installing the PT
unit without removing the power unit,
suspend and support the outboard motor
with a hoist. Failure to do so may result
in the outboard motor falling, which is
dangerous.
• If the PT unit does not operate, loosen the
manual valve and lift up the outboard motor
manually.
• When the manual valve is loosened, be sure to
tighten it to the specified torque after tilting up
the outboard motor.
Manual Valve:
1.8 N · m (1.4 lb · ft) [0.18 kgf · m]
Remove the thrust rod 2.
2.
Remove the bolt 3, then remove the cylinder pin (upper)
3.
4.
4.
Perform the tilt down operation and slightly retract the tilt
rod.
5.
Disconnect the PT motor lead wires from the PT solenoid.
Remove the screw 5 and clamp 6, and pull out the PT
6.
motor lead wires.
Remove the C-ring 7, then remove the cylinder pin
7.
(lower) 8.
Support the PT unit or gas shock absorber with
one hand, pull out the cylinder pin (lower), and
remove the unit rearward.
Remove the PT unit 9 or gas shock absorber 0.
8.
Remove the bushings q, w, e, and r.
9.
7-40
WARNING
4st 25/30 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfs 35d3vs-64110-0

Table of Contents