TOHATSU MFS 25D Service Manual page 225

4 stroke
Hide thumbs Also See for MFS 25D:
Table of Contents

Advertisement

4.
Install the power unit installation bolts and tighten them to
the specified torque in two steps in the order shown in the
diagram.
Apply water-resistant grease to the power unit
installation bolts.
Power Unit Installation Bolt:
First Tightening Torque:
15 N·m (11 lb·ft) [1.5 kgf·m]
Second Tightening Torque:
30 N·m (22 lb·ft) [3.0 kgf·m]
Connect the vapor separator drain hose 4, cooling water
5.
hose (drive shaft housing - vapor separator) 5, and the
vent hose 6.
6.
Connect the cooling water hose (vapor separator - cooling
water check port) 7.
Connect the fuel hose 8.
7.
4st 25/30 2022
A S
B P
5
5-85

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfs 35d3vs-64110-0

Table of Contents