Power Unit
Connect the PT motor couplers 9 and PT switch coupler
8.
0. (Power Tilt Model)
Connect the indicator lamp connectors q.
9.
Install the battery cable w. (Electric Starter Model)
10.
Install the shift rod e and shift lever rod r (Basic Tiller
11.
Model).
Install the cover t.
12.
5-86
4st 25/30 2022