Power Unit
Install the PT relay plate q and the ground lead wire w.
9.
(Power Tilt Model)
Connect the engine temperature sensor coupler e.
10.
Install the ground lead wire r.
11.
Install the ignition coil bracket assy t.
12.
Tighten the ignition coil ground lead wires
together with the bolt y.
Connect the ignition coil couplers u.
13.
Connect the spark plug caps i.
14.
Apply silicone grease to the spark plug insertion
area of each spark plug cap.
Connect the starter solenoid lead wire o and neutral
15.
switch connector p.
Starter Solenoid Lead Wire Nut:
4.8 N · m (3.5 lb · ft) [0.48 kgf · m]
5-80
4st 25/30 2022