Bracket
22) Inspection of Valve
Check the check valve and valve of the tilt rod assy 1 for
1.
dirt or deposits. Clean if necessary.
23) Installation of PT Pump and Motor
Sandwich the PT unit 1 from both sides with wood or
1.
aluminum plates and secure with a vice.
Install the valve 2 and PT pump assy 3, and tighten the
2.
bolt 4 to the specified torque.
PT Pump Bolt:
5 N · m (4 lb · ft) [0.5 kgf · m]
Install the manual valve 5 and tighten to the specified
3.
torque.
Manual Valve:
1.8 N · m (1.4 lb · ft) [0.18 kgf · m]
4.
As shown in the diagram, supply PT fluid to near the upper
surface of the pump chamber.
Recommended PT Fluid:
OIL
ATF DEXRON III
7-46
1
4st 25/30 2022