Power Unit
Install the shift lever shaft 8.
8.
• Apply cold-resistant lithium grease to the shift
lever shaft and shift lever shaft installation area.
• Apply a screw locking agent (ThreeBond 1342)
to the bolts.
9.
Install the cylinder head.
For the installation procedure, refer to "Installation
of Cylinder Head."
10.
Install the pulley and timing belt.
For the installation procedure, refer to "Installation
of Pulley and Timing Belt."
47) Installation of Electrical System Parts
Install the starter motor 1. (Electric Starter Model)
1.
Apply a thin coat of water-resistant grease to the
pinion area.
Install the neutral switch 2 and tighten to the specified
2.
torque. (Electric Starter Model)
Neutral Switch:
3.5 N · m (2.6 lb · ft) [0.35 kgf · m]
5-78
4st 25/30 2022