Kemppi X8 MIG Welder Operating Manual page 44

Hide thumbs Also See for X8 MIG Welder:
Table of Contents

Advertisement

3.
Push the shielding gas hose towards the shielding gas hose connector base until it locks down.
4.
Attach the strain relief to the slot on the wire feeder.
5.
Lock the strain relief latch to secure the strain relief.
6.
Connect the control cable to the connector. Rotate the collar clockwise to lock it in place.
7.
Connect the measurement cable to the connector. Rotate the collar clockwise to lock it in place.
8.
If you have the optional cooler, pull the cover over the cooling water hoses' slot to remove it.
9.
Connect the cooling water hoses to the slot.
10.
Close and lock the cable cabinet door.
When connecting the cables to the wire feeder, route the cables neatly so that the cable cabinet door closes properly.
© Kemppi
44
X8 MIG Welder
Operating manual - EN
1902370 / 2324

Advertisement

Table of Contents
loading

Table of Contents