Mitsubishi Eclipse 1990 Service Manual page 1439

Table of Contents

Advertisement

AUTOMATIC TRANSAXLE OVERHAUL
Transfer shaft
Gauging shim
Wr
shaft.
and two wrenches as shown.
Toraue wrench
while holding transfer shaft gear with Holder
Caution
Original retaining nut must not be re-used. Always
use a new retaining nut when reassembling.
ensure seating of the bearing rollers.
the Transfer Bearing Shim Chart for the required shim.
to 0039 in.).
If end play is too high, install a 0.04 mm
shim. If end play is too low, install a 0.04 mm
in.) thicker shim combination. Repeat until 0.05 to 0.10
mm (0.0020 to
TSB Revision
a 4.66 mm
in.) "test" shim on the transfer
'transfer shaft gear, using Gear Installer
transfer shaft gear nut to 271 Nm (200
Dial Indicator Set
and Special Bolts
and pull the gear while rotating back and forth to
transfer shaft gear end play.
bearing end play has been determined, refer to
play should be between 0.05 to 0.10 mm
in.) end play is obtained.
with Fixture
in.) thinner

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents