B.J.
FRONT AXLE
Drive
(7) Check that the B.J. boot band is secured correctly.
the band is secured incorrectly, repeat steps (4) to (6)
to replace it.
(8) Apply the specified amount of grease to the -boot.
Specified grease: Repair kit grease
(4.59 oz.)
(9) Install the B.J. boot to adjust the clearance (C) between
the B.J. boot end and the stepped
housing is within the standard
Standard value (C): 0.1
(lO)Adjust the opening dimension
as mentioned at the step (3).
Standard value (W): 3.2 mm
portion, and install it so that there is
(D) along the other side.
the special tool to crimp the B.J. boot band (large)
in the same way as the step (5). , ,
value.
Standard value (E): 2.4
<When more than 2.8 mm
is secured incorrectly, repeat steps (11) to (13) to replace
it.
TSB Revision
Shaft
Engine
Engine (Turbo) and'
1.55 mm
the B.J. boot band (large) along the protruding
that the crimped width (E) is within the standard
2.8 mm
Readjust the dimension
the value calculated by the
and repeat step (12).
5.8 mm
in.)
Example: If (E) is 2.9 mm
mm
in.).
less than 2.4 mm
Remove the B.J. boot band, readjust the
dimension (W) of step (10) to the value
calculated by the following equation, and use
a new B.J. boot band to repeat steps (11) to
5.8 mm
in.)
Example: If (E) is 2.3 mm
mm
in.).
that the boot band is secured correctly. If the band
110
oz.)
130
of the B.J.
the standard
clearance
in.)
in.)>
of step
to
equation,
in.),
is 2.9
in.)>
in.),
is 3.5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents