Segway Personal Transporter i2 Parts Replacement Manual page 80

Table of Contents

Advertisement

6. Lift UIC straight up until clear of locator pin 
(refer to 1 in Figure 9‐10). 
locator pin
Figure 9‐10: Lift or Lower UIC Over Locator Pin
7. Angle UIC upward from rear (refer to 2 in 
Figure 9‐10) to expose UIC connectors to A 
and B CU harnesses. While pressing 
connector locking tabs, gently remove 
connectors to disconnect. Do not strain 
harnesses. See Figure 9‐11.
B harness
locator pin
REAR VIEW
Figure 9‐11: Disconnect or Connect A and B Harnesses
8. Lift off UIC and place in ESD bag or on clean 
ESD work surface. 
9‐10
To install UIC:
1. Make sure Segway PT is powered off and 
2.
If harness wires are pinched or exhibit insulation
damage or the connector is damaged so as to
prevent positive locking upon installation, the
harness must be replaced.
3. Orient UIC in console housing. Make sure 
4. To avoid crushing steering sensor harnesses, 
5. Be sure retention putty is installed and 
UIC
A harness
6. Connect (2) CU harness connectors to front 
7. Orient hole in UIC over locator pin (refer to 
console
Segway® Personal Transporter i2, x2, x2 Turf Parts Replacement 
unplugged.
Inspect harnesses for damage to insulation or
kinks. Ensure connector locking mechanism is
intact.
CU harnesses are properly positioned in 
plastic guide clips to prevent crushing of 
harnesses.
make sure harnesses are properly 
positioned in channel around UIC mounting 
bosses. See Figure 9‐12.
keeps harness seated correctly around 
bosses.
of UIC. 
1 in Figure 9‐10) and lower UIC into console 
housing, taking care to fold harnesses into 
void without pinching.
Figure 9‐12: Position Harnesses in Channel

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Personal Transporter i2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Personal transporter x2Personal transporter x2 turf

Table of Contents

Save PDF