● Step 3
After a folder has been selected, STARTER copies the DCB library into this local folder.
2 folders named "OEM" and "USER" are created.
● Step 4
Copy the OEM folder to an empty memory card.
Note
The memory card supplied from Siemens as option S01 or S02 includes, when supplied,
a dump of the internal device firmware. These files are only required to update firmware.
These files can be deleted for all other applications of the memory card. Copy the files
into a local folder of your PG/PC and delete the files on the memory card, before you use
the card for the functions described in this chapter.
● Step 5
Insert the CompactFlash Card into the switched-off drive and switch on (POWER ON).
The DCB library is copied into the non-volatile memory (ROM) in the drive during
power-up. The process is complete as soon as the power-up has ended (operating
state 7.0 reached).
● Step 6
Switch device off/on (POWER OFF / POWER ON). After the new power-up, the DCC is
ready.
● Repeat steps 5 and 6 on additional SINAMICS DCM drives.
Note
If DCC is installed in the drive, the power-up time increases by approx. 10 s.
Note
This procedure does not transfer the STARTER parameter assignments into the unit. In
order to transfer the parameter assignments from STARTER into the drive, the "Load into the
target system" function must be run in STARTER.
SINAMICS DCM DC Converter
Operating Instructions, 12/2018, A5E34763375A
Descriptions of functions