Siemens SINAMICS Series Operating Instructions Manual page 274

Hide thumbs Also See for SINAMICS Series:
Table of Contents

Advertisement

Commissioning
8.2 Switching on
With the basic operator panel BOP20:
(1)p0009 = 30
(1)p0976 = 1
SINAMICS DCM resets all of the parameters to the factory setting, and executes a power on.
The parameters must then be permanently saved by pressing the P button for a longer
period of time (at least 3 seconds, however until the display starts to flash).
8.2
Switching on
After the device is turned on (POWER ON), the drive powers up. Power-up up to operating
state 7.0 in the SINAMICS DCM with the parameters saved (RAM to ROM was carried out)
takes approx. 45 s. Power-up without the saved parameters (first commissioning) takes
approx. 60 s.
Table 8- 1
BOP20 display
Light on the BOP20
-
Display "run up"
Operating state 12.4
Operating state 7.0
Power-up with saved parameters (RAM to ROM was carried out)
1)
The status of the LEDs on the CUD (see also Chapter "Description of the LEDs on the CUD
(Page 635)") can only be seen when the device cover is open.
Note
If options are being used (DCC, CBE20, SMC10, SMC30, TM15, TM31, TM150 etc.) and in
the case of certain device configurations, the duration of the power-up increases.
Note
If an external memory card with previously saved data is plugged into the drive during
power-up, the drive powers up based on the parameter assignments saved on the card
(see also Chapter "Memory card functions (Page 359)").
272
SINAMICS DCM ramp-up times
CUD LED status
RDY: Red
DP1: Red
RDY: orange
DP1: -
RDY: orange
DP1: -
RDY: Green
DP1: -
RDY: Green
DP1: -
Ramp-up time
1)
POWER ON
15 s
35 s
40 s
45 s
SINAMICS DCM DC Converter
Operating Instructions, 12/2018, A5E34763375A

Advertisement

Table of Contents
loading

Table of Contents