Relationship Between The Project To Be Created And The Screen - Omron K6CM User Manual

Motor condition monitoring device
Hide thumbs Also See for K6CM:
Table of Contents

Advertisement

Startup screen
(3)
(2)
(2) When creating a new project
Select [[K6CM] Create the project]
Switch the device to be connected,
set the IP address individually
5-3-2

Relationship between the project to be created and the screen

Use the Motor condition monitoring Tool to create a new project.
The project consists of the following.
• Project file: This file defines the connection configuration of the K6CM.
• Setting file: This is a file for backing up and saving device setting values.
• Log file: The log of the monitoring result is saved.
K6CM Motor Condition Monitoring Device User's Manual (N219)
5 Setting with the Motor condition monitoring Tool
(3) When opening an existing project
When connecting at 1: 1 connection
When connecting via a hub
Refer to "5-4-2 Connection
method of Motor condition
monitoring tool" for details
of connection method
Select [[K6CM] Open the project file]
Monitoring
screen
Click the
[Device setting]
Click the
Button
Device setting screen
5
[Back] button
5 - 23

Advertisement

Table of Contents
loading

Table of Contents