Mounting; Installation Site; Installation On A Carrier Rail; Removal From Carrier Ail - WAGO 852-1305 Manual

8/4-port 100base-t/1000base-sx/lx industrial-managed-switch, 8 ports 100base-t,4 slots 1000base-sx/lx
Table of Contents

Advertisement

38

Mounting

Pos : 21.1 /All e Seri en ( Allgemei ne Module)/Ü bers chriften/Ebene 1/M ontier en - Ü bersc hrift 1 @ 3\mod_1225446744750_21.doc x @ 24900 @ 1 @ 1
5
Mounting
Pos : 21.2 /Serie 852 (ETH ERNET-Zubehör)/Montier en/Montageort 852- x30x @ 24\mod_1452256541388_21.doc x @ 197891 @ 2 @ 1
5.1

Installation Site

The location selected to install the industrial managed switch may greatly affect
its performance. When selecting a site, we recommend considering the following
rules:
Install the industrial managed switch at an appropriate place. See section
"Device Description" > ... > "Technical Data" for the acceptable
temperature and humidity operating ranges.
Pos : 21.3 /Serie 852 (ETH ERNET-Zubehör)/Montier en/Monti eren 852- x30x @ 24\mod_1452258998917_21.doc x @ 197895 @ 22 @ 1
Make sure that the heat output from the industrial managed switch and ventilation
around it is adequate. Do not place any heavy objects on the industrial managed
switch.
5.2

Installation on a Carrier Rail

The carrier rail must optimally support the EMC measures integrated into the
system and the shielding of the internal data bus connections.
Place the industrial managed switch onto the DIN rail from the top and snap it
into position.
5.3

Removal from Carrier ail

To remove the industrial managed switch from the carrier rail, insert a suitable
tool into the metal tab under the switch and deflect the metal tab downward.
You can then release the switch down from the carrier rail and remove it upwards.
Pos : 22 /D okumentation allgemei n/Glieder ungs elemente/---Seitenwechs el--- @ 3\mod_1221108045078_0.doc x @ 21810 @ @ 1
WAGO-ETHERNET-Zubehör 852
852-1305 8/4-Port 100BASE-T/1000BASE-SX/LX
Manual
1.1.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents